Your secret weapon: reach the people who hire, not the pile.  ·  Designed by a recruiter..
← All guides

How to Email the Hiring Manager for an Electrical Engineer Job

From a recruiter with 20 years in hiring

To email the hiring manager for an electrical engineer job, write to the engineering manager who runs the group in the ad: power delivery, building systems, controls or hardware. At a small consulting firm, write to the principal or the PE of record. Send a short note to the recruiter on the posting as well. Open with the kind of work you've designed, the standards you've designed to, and your license status if the job involves sealed drawings.

Try it free. You've got nothing to lose.

Paste the job you applied to and see who's behind it: the hiring manager and the recruiter, with their emails and a note ready to send. Your first 3 lookups are free, and if we can't find a proven contact, it doesn't count.

I recruit for a living, with 15 to 20 openings on my desk at a time and hundreds and hundreds of applicants for each. Engineering resumes blur together. The engineer who writes two clear lines about what they've actually designed is the one who gets a call.

Who an electrical engineer reports to

  • Mid-size and large employers. The Engineering Manager of the group owns the hire. They decide whether the seat needs a PE, an EIT on the path, or neither.
  • Larger, multi-office firms. A Senior Manager of Engineering may oversee several disciplines or regions. Useful if a firm is posting the same EE job in several offices.
  • Small consulting firm. The principal or the PE of record is often the only engineering leader, and the hiring manager.
  • Product companies. A Director of Engineering or Chief Engineer signs off on senior hires. For a mid-level role, the group's manager decides.

The lead or senior electrical engineer, often the PE who stamps the group's drawings, will usually run your technical interview. They know exactly what you'd be designing. HR and talent acquisition coordinate, but they can't judge whether your relay-setting experience is real.

Utilities, engineering firms, manufacturers and government contractors, both primes and subs, all hire electrical engineers directly. Every one of them is a real employer.

Power or electronics? Two jobs under one title

Power and building systems. Utilities, consulting firms, MEP firms, data center and renewables developers. Ads mention substations, protection and control, arc flash, short circuit studies, interconnection and one-lines. A PE often matters, because someone has to seal drawings for utilities and permits. What wins: the standards you've designed to, project sizes, and stamped work.

Electronics and hardware. Manufacturers, defense and aerospace, semiconductors, telecom. Ads mention schematic capture, PCB layout, firmware, signal integrity, EMC and test. A PE rarely matters; the product is the proof. What wins: products shipped, tools used, testing and certification work. At defense contractors, clearance status often comes first.

Write to the side the ad is on. A manager can tell from one sentence whether you read it.

The stamp question

If the job is power or building systems, the first thing the manager wonders is whether you can seal drawings, or how close you are. The path takes years: a degree, the FE exam, several years of work, then the PE exam.

So say it plainly. "PE in Ohio and Indiana." Or "EIT, four years of power experience, sitting for the PE Power exam this spring." Don't let the manager guess. If you don't hold the license and the ad says "PE preferred," still apply, and address it head-on.

Who recruits for it, and when to write to each

Corporate recruiters. Utilities, large firms and manufacturers have engineering recruiters. Write to them. I'm on the candidate's side here; a note that says "four years of substation design, EIT, PE exam in April" tells me in seconds where you fit. I often call engineers who write to me, and I forward the good ones to the hiring manager.

HR at small firms. HR collects applications; the principal decides. Write to the principal.

Engineering staffing agencies. Agencies fill a lot of contract and direct-hire engineering work, especially at contractors and on big projects. If an agency posted the ad, its recruiter is your first contact.

Write to both the manager and the recruiter. Hiring managers forward me candidates who contacted them directly, and many of those people got interviews and offers.

What the manager worries about

Grid work, data centers and renewables have kept power engineers busy. The Bureau of Labor Statistics projects electrical and electronics engineering employment to grow 8 percent from 2025 to 2035, with about 16,300 openings a year.

But the manager is thinking about something closer. On the power side, it's a project with an energization date set by a utility or a customer, and drawings that need to be done and checked before it. On the electronics side, it's a product schedule and a design review nobody has time to prepare for.

The line that answers it:

"I've designed three distribution substations to the same utility standards you work with, and I can start on an active project within a month."

Name only standards, tools and projects you've really worked on.

A sample email to an engineering manager

Subject: Electrical Engineer (Power): EIT, 4 yrs substation design, PE exam in April

Hi Steven,

I applied today for your Electrical Engineer opening in the power delivery group. I've spent four years designing distribution substations and protection schemes, including one-lines, relay settings and short circuit studies for two investor-owned utilities. I'm an EIT and sitting for the PE Power exam in April. I'm ready to pick up an active project and would like to hear what your group has on the board. Do you have 15 minutes this week?

Thanks, Andrea Collins (555) 012-7745

A short note to the recruiter

Hi Mark, I applied for the Electrical Engineer role in power delivery. Quick summary: four years of substation and protection design, EIT, PE Power exam in April, available within a month. I also sent a brief note to the engineering manager. Happy to help with anything you need.

Timing and one follow-up

Tuesday through Thursday, early morning before site visits and design reviews, or late afternoon. Stay away from submittal weeks and energization dates. A reposted ad, or one where the PE line has moved to the top, means the manager is feeling the gap.

If there's no reply in about five business days, follow up once in the same thread:

"Following up on the power engineer opening. Still very interested, and I'm glad to send a sample one-line or study summary if that helps."

Then keep applying. Engineering managers are slow to reply during deadlines, not uninterested.

What to do today

  1. Decide which side the ad is: power or electronics.
  2. Find the engineering manager of that group, or the principal at a small firm.
  3. State your license status clearly if the job involves sealed work.
  4. Name the standards, tools or products you've really worked on.
  5. Send a three-line note to the recruiter.
  6. Set one follow-up for five business days out.

If you don't know who to write to, paste the job link at emailthehiringmanager.com and it looks for the hiring manager and the recruiter for that job. It won't always be right, so check the titles. If your work leans toward automation, see the controls engineer guide, and if you're light on one requirement, read how to email a hiring manager when you're not a perfect fit.

Common questions

Who is the hiring manager for an electrical engineer?

The engineering manager of the group the job sits in, such as power delivery, building systems, controls or hardware. At a small consulting firm, it's the principal or the PE of record. Directors and VPs approve headcount but rarely pick a single engineer.

Do I need a PE license to apply?

For power and building-systems work where drawings must be sealed, it often matters a lot. For electronics and hardware design, it's rarely required. If you're an EIT on the path, say how far along you are.

What does "PE preferred" really mean?

Sometimes it means required, and the manager just didn't want to empty the applicant pool. If you don't hold a PE, address it directly in your email with where you are on the path.

When should I email an engineering manager?

Tuesday through Thursday, early morning or late afternoon, around design reviews and site visits. Avoid the days right before a big submittal or an energization date.

Related guides

Sources

Try it free. You've got nothing to lose.

Paste the job you applied to and see who's behind it: the hiring manager and the recruiter, with their emails and a note ready to send. Your first 3 lookups are free, and if we can't find a proven contact, it doesn't count.